A selection of images showing the installation of the new visitors’ lift. The structural steel framework came in 4 sections and each section was craned from outside into the Turbine Hall, then craned onto level 2, and finally craned into position and then welded.
- Steel frame craned into position
- Steel frame into Turbine Hall
- Steel frame external shot



0 Responses to “Visitors’ lift installation”