Visitors’ lift installation

A selection of images showing the installation of the new visitors’ lift.  The structural steel framework came in 4 sections and each section was craned from outside into the Turbine Hall, then craned onto level 2, and finally craned into position and then welded. 


0 Responses to “Visitors’ lift installation”


  • No Comments

Leave a Reply



500 Harris Street Ultimo, PO Box K346 Haymarket, Sydney NSW 1238, Australia.
NSW Government | Privacy | Some rights reserved
Find us on Facebook spacer follow us on Twitter spacer Powerhouse Museum on Flickr spacer google plus